RAM Construction Demo 6-19Please pardon our dust! RAM Construction Services is on site to demo the deteriorating concrete steps and wall caps and to rebuild the stairs. They’ll refurbish the handicap ramp and railings as part of the same project. Also in progress is a rebuild of the retaining wall at the staff entrance on the west side of the building. RAM is hopeful that, with good weather, the project can be wrapped up before the Coast Guard Festival. In the meantime, library visitors will need to use the 4th Street or garage entrances. Stay tuned!